Special lifting equipment and assembly aids are required to place/remove machines, systems, machine parts and system parts in/from locations that are difficult to access, to move them using crane systems and to secure them tightly when transporting to prevent hazards or to protect people and materials, and to guarantee that work is carried out economically and in a time-saving manner.

 

Procedure and sub-steps

  • Recording the job definition
  • Analysing the actual status and drawing up a solution proposal
  • Producing a system drawing and project planning
  • Obtaining structural analyses and legally required authorisations
  • Producing and constructing the product

Examples

  • A-cradle systems, single girder crane track, etc.
  • Load beams, spreaders, etc.
  • Platforms, pedestals, auxiliary constructions, etc. in systems construction
  • Adjustable angled carriage for bulky packages